This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
powerschool:powerteacher:finalizegrades [2017/10/06 10:47] lokes |
powerschool:powerteacher:finalizegrades [2017/10/24 09:58] (current) lokes |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Finalize Grades ====== | + | ====== Finalize Grades |
Once a teacher has completed entering grades for the current quarter, the final step is to Finalize the Grades. The Office Staff runs the //Section Readiness Report// against all the classes to see which remain to be finalized. This is an important communication tool. Once all the grades are finalized, the SIS Technician is able to begin the grade storing process. | Once a teacher has completed entering grades for the current quarter, the final step is to Finalize the Grades. The Office Staff runs the //Section Readiness Report// against all the classes to see which remain to be finalized. This is an important communication tool. Once all the grades are finalized, the SIS Technician is able to begin the grade storing process. | ||
Line 13: | Line 13: | ||
- Click on the **Final Grade Status** button. | - Click on the **Final Grade Status** button. | ||
- The //Qx Final Grade Status// window will appear. | - The //Qx Final Grade Status// window will appear. | ||
- | - Check the very faint box in the top right corner | + | - __Check |
+ | - A green check will appear in the Final Grade Status box at the bottom of the page. | ||
- Add a comment if desired. The comment is only visible by the clerks running the [[powerschool: | - Add a comment if desired. The comment is only visible by the clerks running the [[powerschool: | ||
- Click **Save** | - Click **Save** | ||
Line 19: | Line 20: | ||
{{: | {{: | ||
+ | The checkbox in the top right corner is very important. | ||
{{: | {{: |