powerschool:powerschool:quickexport
Differences
This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
|
|
powerschool:powerschool:quickexport [2023/08/16 16:36] lokes |
powerschool:powerschool:quickexport [2023/08/16 16:42] (current) lokes |
| ====== Using Quick Export to Analyze Data for Missing STI's ====== |
| |
Data preparation for growth assessments is scheduled to be pulled mid August. Student STI's along with other required data need to be in PowerSchool before the end of this week. STI's, state testing identifiers, are used statewide for growth assessments and testing purposes. They are normally assigned automatically through a program called SIF. But before this process can happen the required fields (below) must be entered in PowerSchool. | Data preparation for growth assessments is scheduled to be pulled mid August. Student STI's along with other required data need to be in PowerSchool before the end of this week. STI's, state testing identifiers, are used statewide for growth assessments and testing purposes. They are normally assigned automatically through a program called SIF. But before this process can happen the required fields (below) must be entered in PowerSchool. |
| |
powerschool/powerschool/quickexport.1692218188.txt.gz · Last modified: 2023/08/16 16:36 by lokes